The scope of work included the following construction items:
* Full gut-remodel of the house that converts a 2-bedroom, 2-bathroom house to a 5-bedroom, 5.5-bathroom house
* New floor plan configuration on the main level and upper level.
* Converting the ground floor into living space and adding bedrooms, bathrooms and a sauna.
* Remodeling the existing kitchen and bathrooms.
* Full seismic upgrade of the house.
* Adding a new deck.